hodog
with Aaron P - 18+ tree on tussy and filmore
Tussey Mountain Trail
2017-05-05
6.5
hodog
with J. Stout and M. Myers. removed berm per DCNR complaint
Tussey Mountain Trail
2017-04-14
7
saclydesdale
Cleared 14 trees from Lower (Laurel Run Rd - Maguire) and Maguire
Lower Trail
2017-03-13
3.25
hodog
fixed trail ramps and other rock work
Tussey Mountain Trail
2017-02-24
2.5
Scott Corbin
Tramway Trail near Greenwood Furnace SP - Cleared 2 downed trees between crossing with RT305 and first cabin (trail on North side of RT305).
OtherRothrock
2016-10-31
2
saclydesdale
Chris, Jason, Jim & Neil. Worked on the dips from the top to the first reroute and the first reroute cleaning up the machine work
Croyle
2016-10-23
16
saclydesdale
Chris, Jason, Jim & Neil. Worked on the dips from the top to the first reroute and the first reroute cleaning up the machine work
Croyle
2016-10-23
16
saclydesdale
Aaron H., Jason, Mike C., Corey, Jim, Harry. Hand work on Croyle cleaning up the machine areas - working from the bottom
Croyle
2016-09-25
33
saclydesdale
Dave, Jeff, Jim, Mike C., Harry, Neil, Aaron H., Donna M. Post machine hand work, working up from the bottom of the trail
Croyle
2016-09-18
48
saclydesdale
Harry cleaned up upper Lonberger, improving the sight lines
Lonberger
2016-09-01
4
Scott Corbin
Tramway Trail near Greenwood Furnace SP - Cleared 3 downed trees and cleared miscellaneous debris between crossing with RT305 and first cabin (trail on North side of RT305).
OtherRothrock
2016-08-30
2
saclydesdale
Aaron H., Corey, Neil, Tom K., Chris, Harry, Jim. Clearing the 2nd reroute area for the work to be done
Croyle
2016-08-21
37
saclydesdale
Scott C., Harry, Lora, Neil, Brian. Clearing the first reroute for the Croyle work
Croyle
2016-08-14
27.5
saclydesdale
Black Gum trail - brush cutting
OtherRothrock
2016-08-07
2.75
Scott Corbin
Tramway Trail near Greenwood Furnace SP - Cleared 3 downed trees and cleared miscellaneous debris.
OtherRothrock
2016-06-30
1.75
Scott Corbin
Cleared downed trees on lower Sass (from pipeline down to Spencer/Rag Hollow).
Sassafras
2016-05-09
1.5
Scott Corbin
Cleared downed trees on lower Sass (from pipeline down to Spencer/Rag Hollow).
Sassafras
2016-05-09
1.5
saclydesdale
Removed downed trees across Tussey Mountain Trail with Lora Z.
Tussey Mountain Trail
2016-04-17
9
saclydesdale
Removed downed trees across Tussey Mountain Trail with Lora Z.
Tussey Mountain Trail
2016-04-17
9
saclydesdale
Jim G., Harry S., Mike M., and Ryan L, cleared debris and trail from Treaster Kettle Rd back towards Leniency
Tussey Mountain Extension
2016-04-17
18
saclydesdale
Worked with Corey Dickkman and 3 community service helpers to brush cut Greenshoot, connector between Lower and Greenshoot and the rerouted portion of Lower.
Cleared trees off Greenshoot, Bald Knob and Maguire
Bald Knob Ridge Trail
2016-04-10
41.75
saclydesdale
Worked with Corey Dickkman and 3 community service helpers to brush cut Greenshoot, connector between Lower and Greenshoot and the rerouted portion of Lower.
Cleared trees off Greenshoot, Bald Knob and Maguire
Bald Knob Ridge Trail
2016-04-10
41.75
saclydesdale
Corey D. worked with 3 volunteers to brush cut the connector between Lower trail & Greenshoot, Greenshoot all the way to Bald Knob and the rerouted portion of Greenshoot. Neil M., cleared trees off Greenshoot, Bald Knob and Maguire
Greenshoot
2016-04-09
41.75
Scott Corbin
Cleared 6 downed trees on Croyle Run Trail. Cleared 1 downed tree on Telephone Trail. Cleared two downed trees on Lower Sassafras from Broad Mtn road down to the pipeline. General debris clearing on all.
Croyle
2016-03-31
6
saclydesdale
Thanks to Harry, Lora, Bob, Jeff, Chris, Emory, Corey, Brad, Neil for the help today. Trail work was on John Wert cutting back the rhododendron and rock armouring some of the mud holes
John Wert
2016-03-20
40.5
Tom Kistler
Rode in and chainsawed off four fallen Oak trees on the bottom section of Sand Spring. All open from Green Shoot down now.
Sand Spring Trail
2016-03-15
2.25
Ryan
Cleared all trees from bear meadows to the gas line.
John Wert
2016-03-09
3
saclydesdale
Blowing debris off the trails and some lopper work. Dave P., Neil M., Austin K., Jeff B. Cleared Bailout, Tussey Mtn Extension from furtherest intersection with Leniency up to the Beer Tap (Tussey Mtn Trail) and the entire Leniency
Leniency
2016-03-05
14.5
saclydesdale
Scouting Greenlee trail that links from Croyle area to Whipple, day 2 from Owl Gap down to where left off the day before and then up to Greenlee RD in the vicinty of Croyle Trail
OtherRothrock
2016-02-07
4.25
saclydesdale
Scouting for new trail on Greenlee mtn. Looking at the lower end off Laurel Run Rd near Whipple dam
OtherRothrock
2016-02-06
3.25
saclydesdale
Checking the reroute proposal for the entrance of Tussey Mtn trail relocation at the intersection with Bear Meadows Rd
Tussey Mountain Trail
2016-02-06
1.75
saclydesdale
Meeting with DCNR about the trails in Rothrock in the Pine Grove Mills area. Focussed on getting these trails on the map and SFER completed etc., also was accompanied by Donovan Neal and Erik Lenzing. Developed plan with DCNR for next steps
OtherRothrock
2016-01-28
12
saclydesdale
Removed the four trees on Lower near the intersection with Sand Spring and one further up on the rerouted portion past the intersection with the connector
Lower Trail
2016-01-02
4
saclydesdale
Removed two trees from Dylan's Path and 14 from Tussey mountain trail
Tussey Mountain Trail
2015-12-26
4.5
saclydesdale
Ho, Jason and Mike restored the washed section around the dip turn at the tree. Carted dirt in and covered and packed over the roots etc
Three Bridges
2015-12-26
9
saclydesdale
Perry and Neil, cleared one tree off Tussey Mountain Trail and another off the upper part of Lonberger
Tussey Mountain Trail
2015-11-22
2.5
saclydesdale
Chris Bumbarger cleared trees off Tussey Mountain Trail from Kettle to Fillmore
Tussey Mountain Trail
2015-11-22
4.5
saclydesdale
Lora Z., Neil M., Rob B., plus 7 community svc volunteers brush cut/clear Three Ski Trail, Goose Club to Tramway, Tramway the whole length, and One Ski Trail in conjunction with Mike & Missy Rubano, Alex Gentry and Mike Dinsmore. Work was done in and around Greenwood Furnace SP and adjoing Rothrock SF
OtherRothrock
2015-11-08
73
saclydesdale
Meet with DCNR & RMBA to go over and walk trails looking at what needs to be done and review routings
OtherRothrock
2015-10-13
4.5
saclydesdale
Henry Margusity - cleared Frog Hollow in Musser Gap
OtherRothrock
2015-10-04
4.5
saclydesdale
Surveying Greenwood Furnace trails, Brush Ridge Rd, One Ski Trail, Three Ski Trail, Viantown Trail, Tranway Trail, Four Ski Trail & Main Ski Trail to map and understand scope of upcoming trailwork
OtherRothrock
2015-10-04
6
saclydesdale
Brush cutting Mountain Mist Trail, Lone Pine Trail & Deer Path between the two. Redirected the "weep" just after the stream crossing, cleaned up the top end of Mountain Mist Trail, cleaned up Lone Pine Trail, Deer Path down to the intersection with Mountain Mist Trail and this section of Mountain Mist Trail up to the vista

This is the time for five of the 10 volunteers overseen by Ho, Mike & Neil - had 10 volunteers - Entry 1
MusserTrail
2015-09-27
44
saclydesdale
Brush cutting Mountain Mist Trail, Lone Pine Trail & Deer Path between the two. Redirected the "weep" just after the stream crossing, cleaned up the top end of Mountain Mist Trail, cleaned up Lone Pine Trail, Deer Path down to the intersection with Mountain Mist Trail and this section of Mountain Mist Trail up to the vista

This is the time for five of the 10 volunteers overseen by Ho, Mike & Neil - had 10 volunteers - Entry 2
MusserTrail
2015-09-27
44.5
saclydesdale
Brush cutting Mountain Mist Trail, Lone Pine Trail & Deer Path between the two. Redirected the "weep" just after the stream crossing, cleaned up the top end of Mountain Mist Trail, cleaned up Lone Pine Trail, Deer Path down to the intersection with Mountain Mist Trail and this section of Mountain Mist Trail up to the vista

This is the time for Ho, Mike & Neil - working with the 10 volunteers
MusserTrail
2015-09-27
27
Tom Kistler
Chainsawed deadfalls off of Stavefield and Deaf Run trails near Colyer Lake
OtherRothrock
2015-09-22
2.25
saclydesdale
Chris did fallen tree removal and clean up
Ross
2015-09-19
5.5
saclydesdale
Brush cutting Tussey Mtn trail, Dylan's path from the beginning of the burn area near Filmore trail all the way to the beer tap and then down Dylan's Path.

This is the time for five of the 10 volunteers overseen by Lora, Ho & Neil - had 10 volunteers - Entry 1
Tussey Mountain Trail
2015-09-19
49
saclydesdale
Brush cutting Tussey Mtn trail, Dylan's path from the beginning of the burn area near Filmore trail all the way to the beer tap and then down Dylan's Path.

This is the time for five of the 10 volunteers overseen by Lora, Ho & Neil - had 10 volunteers - Entry 2
Tussey Mountain Trail
2015-09-19
49
saclydesdale
Brush cutting Tussey Mtn trail, Dylan's path from the beginning of the burn area near Filmore trail all the way to the beer tap and then down Dylan's Path.

This is the time for Dave, Ho, Lora & Neil doing the work with the 10 volunteers
Tussey Mountain Trail
2015-09-19
36
saclydesdale
Ho & Mike brush cut from Kettle to the burn area
Tussey Mountain Trail
2015-08-27
7.5
hodog
brushcut from filmore to almost the bulldozer cut toward Kettle.
Tussey Mountain Trail
2015-08-14
2.5
saclydesdale
Brett, Aaron, Ryan, Rich clearing out BR&S trail off Pigpile in preparation of PA Enduro Days. Brush cutting, log removal
OtherRothrock
2015-08-08
16
hodog
removed deadfall with Myers and Cerenzia
Croyle
2015-07-24
3.5
hodog
Fixed entrance.
Three Bridges
2015-07-24
4.5
hodog
fixed muddy spots
Lonberger
2015-07-23
2.5
hodog
removed deadfall
Wallace
2015-07-21
1.5
saclydesdale
Remove deadfall off trail (Ho, Mike, Neil)
Sass-xx
2015-07-12
1.5
saclydesdale
Cleared down trees on Ridge trail and Dylan's Path
Tussey Mountain Trail
2015-07-05
4.25
saclydesdale
Removed downed trees on Lonberger and Three Bridges trail
Lonberger
2015-06-15
1.5
David P
Cut 4 logs of of Wert Trail and also a few off of Tussey ext
John Wert
2015-06-10
5
Tom Kistler
Weed-eating and trimming back DEAF RUN TRAIL from Boal Gap Road, leading East.
OtherRothrock
2015-06-09
3.5
Dieter
Brush cut/raked the top of Croyle (flat section); Brush cut/raked very top of Wildcat Gap
Croyle
2015-06-03
3.5
Ryan
4 of us Brush cut Bigelow trail from Rag Hollow road to Pigpile trail intersection.
Pigpile
2015-06-02
11
Dieter
Brush cut entirety of Ross and removed 2 non-ridable downed trees.
Ross
2015-06-01
6.25
Tom Kistler
Cleared 5 down (and leaning) trees off of the Deaf Run trail near Colyer Lake.
OtherRothrock
2015-05-20
1.75
hodog
Removed logs from tusexdos to beer tap
Tussey Mountain Trail
2015-05-07
2.5
hodog
Removed logs from Upper Lonberger. Blocked 'shortcut' behind tree.
Lonberger
2015-05-07
1.5
hodog
Scouted southern Greenlee mtn near Whipples - beldleheimer side.
OtherRothrock
2015-04-23
3
Ryan
Cleared downed trees from the trail
Beautiful
2015-04-05
2.75
saclydesdale
Cleared 16 trees; 1 - on Greenshoot, 2 - on Connector btwn Greenshoot & Lower, 3 - on Lower, 2 - on Maguire, 1 - on Dylan's Path, 6 - on Tussey Ridge, 1 - on Lornberger
Greenshoot
2015-04-04
9.5
saclydesdale
Cleared 15 trees from the trail. From Beer tap to Kettle
Tussey Mountain Trail
2014-12-20
3.5
saclydesdale
Reroute around the mud hole on the link between the old logging road and the power line. Also began clearing some of the loop around the ridge
MusserTrail
2014-12-07
100
saclydesdale
Leaf blowing starting from the Musser Gap Trail side
MusserLink
2014-11-23
3.25
saclydesdale
Henry Margusity - Clearing Frog Hollow - downed trees, blow
OtherRothrock
2014-11-10
8.5
saclydesdale
Reopening Yoder Trail from Wallace to Seger Rd. Neil M., Mike D., Cory D., Tom K., and the 3 from PSU cycling and the rest other 15 volunteers
Yoder
2014-11-09
169.5
saclydesdale
Henry Margusity - Clearing Frog Hollow - downed trees, blow
OtherRothrock
2014-11-09
4.5
saclydesdale
Henry Margusity - Clearing Frog Hollow - downed trees, blow
OtherRothrock
2014-11-08
4.5
saclydesdale
Rock armor the walls under the bridges across the springs on Lower trail. Place second bridge over weep.

Thanks to the 14 volunteers who helped out, (Aaron H, Mike C., Mike B., Mike M., Mark W., Dave R., Jim G., Sean M., Brandon T., Tim W., Kurt S., Cory D., Neil M., Henry M.)
Lower Trail
2014-10-26
63
hodog
Removed 4 deadfall with Mike Myers.
Tussey Mountain Trail
2014-10-26
3
hodog
Removed 2 deadfalls from Lower trail.
Lower Trail
2014-10-17
1
hodog
removed logs, sticks, and one blowdown
Town Trails
2014-09-30
1
hodog
Removed sticks, deadfall on trail - scouted lost trails.
Town Trails
2014-09-23
1
JSto
Replaced the bridge, built a bridge deck for a future project, and spent some time opening up the drainage. We had a crew of seven volunteers.
Lower Trail
2014-09-21
27.5
Clay Chiles
Cut out blown down branches across trail, near campsite. There are still some hung up branches that will need to be cut once they fall.
Three Bridges
2014-09-16
1.5
Tom Kistler
Clipping and chopping brush on Filmore Trail from the Tussey Ridge down to Bear Meadow's Road.
OtherRothrock
2014-09-08
2.5
Clay Chiles
Cut deadfall across Blue-White Trail in Shingletown gap.
Blue-White Trail
2014-09-04
1.5
Tom Kistler
Chainsawed two fallen trees off of Deaf Run Trail neat Penn Roosevelt.
OtherRothrock
2014-08-24
0.75
hodog
removed logs, stick, debris, cut back brush
Town Trails
2014-08-22
3
Clay Chiles
I took the little guy with me today and cleared a downed log across the new section of Lower Trail, just after it peels off from the original route. We then hiked in from the other side (near reservoir) and cut out a double log about a mile up the trail. Rattlesnake sighting on large log, just off trail on our way out.
Lower Trail
2014-08-19
3.5
Tom Kistler
Two large White Pine trees were blocking the Eastern Half of the Leniency Trail. Chainsawed those off, and walked the rest of the Loop picking off the loose stones and the fallen branches.
Leniency
2014-08-19
1.25
saclydesdale
Remove 4 trees down in the burn section near Filmore trail. Walk Tuxedo and Upper Lornberger too since was in the area
Tussey Mountain Trail
2014-08-17
3
Clay Chiles
Cut log out that was across upper Maguire
Maguire Trail
2014-08-15
1.5
jim g
Jim and Julia Glover, and Clay Chiles cut logs (Clay cut on Lower and Maguire), and rebuilt ramps on Shingletown bridge.
Lower Trail
2014-08-15
5.25
Tom Kistler
Brushcutting the thick and overgrown area of the Beer Tap Loop at the end of the Tussey Ridge.
Tussey Mountain Trail
2014-08-07
2
Tom Kistler
Picking loose rocks and sticks off of New Laurel Run after last night's storm.
New Laurel Run
2014-07-28
1.5
Tom Kistler
Chainsawed two downed trees on the Tussey Extension, near Leniency entrance.
Tussey Mountain Extension
2014-07-27
0.75
hodog
Jason Stout led Jim Glover, Mike Dwyer, Mike Myers, Yoda, and HO team on re-engineer of turn to maximum bike speed through radius. We also scouted other turns for future trail work.
Maguire Trail
2014-07-20
25.5
JSto
We increased the radius of a stuffy bend in the trail.
Maguire Trail
2014-07-20
12
saclydesdale
cleared downed trees, greenshoot, maguire and lower trails
Lower Trail
2014-07-11
3.5
David P
spread shale on lonberger and lower trail with a bobcat skid steer and a gator. assisted by Terri R, and Howie S.
Lonberger
2014-06-21
27
hodog
Mike Dwyer led group to fix problem areas on Greenshoot. Jim Glover, Jason Stout, Donna Matthews, Carol Younkins, MaryKate Savage, and Aaron Hofelt attended.
Greenshoot
2014-06-20
24.5
hodog
Mike Dwyer led group to fix problem areas on Greenshoot. Jim Glover, Jason Stout, Donna Matthews, Carol Younkins, MaryKate Savage, and Aaron Hofelt attended. Part 2 - missed 4 hours and travel time.
Greenshoot
2014-06-20
6.5
hodog
Cleared 3 deadfall and branches on the trail. Replaced a few rocks the bears had moved.
Sand Spring Trail
2014-06-18
3.5
saclydesdale
Brush cut the extension along the deer fence
Tussey Mountain Extension
2014-06-10
5.75
David P
Weed wacked the tall grass in the fire burn section of Tussey ridge with the help of Craig F, Neil M, Dave S.
Tussey Mountain Trail
2014-06-10
16
David P
cut out big dead fall on wert and a few other hanging trees, then went and worked on drainage on Lonberger trail.
John Wert
2014-06-09
3
saclydesdale
Brush cut upper 1/2 along telephone line - drivetrain side of the trail
New Laurel Run
2014-06-09
3.5
MikeB
Mike and Rich S finish brush cutting and raking Indian. Removed on small tree from off camber rocky section.
Indian
2014-06-08
3.5
MikeB
Mike, Rich, Jimbo and Drew brush cutting and raking Indian
Indian
2014-06-05
4
MikeB
Mike, Rich S, Jimbo and Drew H brush cutting and raking Indian. 2 entries by mistake for a total of 16 man hours with travel.
Indian
2014-06-05
12
David P
cut out log half way up new laurel run tral and removed several roots and loos rocks along the way.
Assisted by Terri
New Laurel Run
2014-05-26
3
HenryMargusity
Removed tree off of Greenshoot. Fixed the log jump on Greenshoot. Removed tree off Loneberger.
Greenshoot
2014-05-23
2
Ryan
removed a downed tree approx. 1/2 mile in from the east end
John Wert
2014-05-22
1.5
soccio
Used loppers and shovel on the lower end of Hessick trail to get rid of brush, roots, and leftovers from the chainsaw/brushcutter work.
OtherRothrock
2014-05-21
1.75
Ryan
Finished raking Long Mt. trail.
OtherRothrock
2014-05-21
3
Tom Kistler
Lopping and clearing the Hessick Trail for the TSEpic planned to come through. Lots still to do!
OtherRothrock
2014-05-20
1.5
David P
Long Mountain trail brush cut for the TSE, 8 volunteers. Ryan, Mark f, Dave P, Terri R, Matt S, Mike D, Kerry s, Will F,
OtherRothrock
2014-05-20
32
Ryan
Trimmed brush back from the trail and removed 3 trees you had to duck under. Kerry Smeltz and Matt Spigelmyer helped.
Sass-xx
2014-05-13
7
saclydesdale
Removed dead falls on Ridge from Kettle to the Beer Tap and the loop to the gas line
Tussey Mountain Trail
2014-05-10
2.25
David P
Finished work on leniency trail!!!!! thanks to Ryan, Mark, Terri, Dave, Nick, Kerry. Well done our best trail work project so far!!
Leniency
2014-05-10
45
David P
continued working behind the bobcat 324, Ryan, Dave, Mark, Frank, Jeremy, Mike. all most made it to the top.
Leniency
2014-05-08
29
David P
Continued bench cutting with the bobcat 324 on Leniency trail with Ryan E, Dave P, Terri R, and Mike L.
Leniency
2014-05-07
25
David P
continued bench cutting on Leniency trail with the bobcat 324, Ryan E, Mark F, Dave P, Terri P, Kelly S, Nick D,
Leniency
2014-05-06
31.25
Ryan
Bobcat 324 mini excavator work. Bench cutting
Leniency
2014-05-05
5.75
Ryan
Mark F. working behind the mini with hand tools.
Leniency
2014-05-05
4.5
Ryan
Bobcat 324 mini excavator work. Bench cutting
Leniency
2014-05-03
8.75
Ryan
Mark F. working behind the mini with hand tools.
Leniency
2014-05-03
8.5
Ryan
Bobcat 324 mini excavator work. Bench cutting
Leniency
2014-05-02
2.5
Ryan
Mark F. working behind the mini with hand tools.
Leniency
2014-05-02
2.5
Scott Corbin
Cleared 3 downed trees; 2 on Lower Lower and 1 on Lower at the intersection of Lower Lower.
Lower Trail
2014-04-27
2.5
JSto
Removed logs and branches from the trail. Removed many logs that were lining the trail.
Greenshoot
2014-04-26
1.5
JSto
Quick improvement to the stream crossing - cleaned obstructions that were forming a dam, causing further eroding and widening of the channel. Set a few rocks. More attention is needed.
Lower Trail
2014-04-26
0.25
JSto
Removed a sketchy log pile and cleared some deadfall.
Maguire Trail
2014-04-26
1.25
hodog
cut out dangerous 'pungi' stick, cut several branches/snags on trail, removed firepit with Carol Younkins.
Tussey Mountain Trail
2014-04-26
1
Tom Kistler
Backpacked chainsaw in and removed 5 deadfalls off of the lower end of the Bald Knob Ridge Trail.
Bald Knob Ridge Trail
2014-04-24
2
JSto
Cleared some branches, removed a few logs.
Greenshoot
2014-04-24
0.25
David P
Scouted and pin flagged new lines for machine built trail. led by Jeremy Wimpy, helped by Ryan E, and Dave P.
Leniency
2014-04-23
12
Scott Corbin
Worked on lower Sassafras, Greenwood Furnace side. Cleared several downfall trees and misc debris.
Sassafras
2014-04-20
4
Scott Corbin
Cleared several fallen trees, trimmed overgrowth, and cleared debris.
Telephone
2014-04-19
4
hodog
Removed deadfall with assistance from Mike Cerenzia and Jason Stout.
Brush Ridge
2014-04-19
0.75
hodog
Added debris to block a shortcut around a tree.
Three Bridges
2014-04-18
0.25
Tom Kistler
Chainsawed deadfall across the Little Shingletown Trail, below the firepit.
Little Shingletown Trail
2014-04-12
1
Tom Kistler
Chainsawed deadfall across the Little Shingletown Trail, below the firepit.
Little Shingletown Trail
2014-04-12
1
hodog
Removed one deadfall from trail with personal handsaw.
Carol Younkins assisted.
Sand Spring Trail
2014-04-06
0.5
hodog
Removed 3-4 deadfall with our personal handsaws and repaired ramp.
3 workers: Al Runkle, Jason Stout, and myself.
Tussey Mountain Trail
2014-04-05
1.5
Michael Lindeman
Removed blow downs and other debris/brush/garbage on Beautiful and Brush Ridge Trails.
Beautiful
2014-03-31
2.25
Tom Kistler
Chainsawed downed tree on the bottom of The Extension. Also cut several downed, or leaning trees on Leniency and Bailout trails.
Leniency
2014-03-23
1.75
JSto
Cleared trail of debris.
Maguire Trail
2014-03-22
2.25
Tom Kistler
Deaf Run Trail Hiked in and cut and removed 4 trees blocking the East and the West branches of Deaf Run. (Very icy under the snow on the upper East Branch, where the stream tracks the trail, so BEWARE!)
OtherRothrock
2014-01-23
3
Neil Millar
Cut out 4 downed trees
Lonberger
2014-01-01
2.5
Neil Millar
Hike up to Charcoal flats, and down Lower, cleared 4 trees
Charcoal Flats
2013-12-29
3
Neil Millar
Ride in cut trees down on Maguire and Mid Greenshoot
Maguire Trail
2013-12-28
2
Aaron Hofelt
Removed deadfall, branches
John Wert
2013-12-23
1.25
Aaron Hofelt
Removed deadfall, rebuilt ramp
Tussey Mountain Trail
2013-12-23
1.25
Aaron Hofelt
Removed widowmaker, tree tops/deadfall
Lonberger
2013-12-23
1.25
Neil Millar
Trimming iced brush, cutting out down logs. Shingletown gap - Lower - Maguire - Bald Knob - connector - Upper Lower
Bald Knob Ridge Trail
2013-11-30
3
Henry Margusity
Mike Lindeman and Henry Removed trees from the the ridge, Loneberger, North Meadows and Camp trails.
Tussey Mountain Trail
2013-11-24
7.75
Terri Rudy
5 leaders - Mike L., Henry M., Terri R., Neil M. and Clay C. - led 17 community service NMBA volunteers on Tussey Ridge trail to finish brush cutting and loppering the trail.
Tussey Mountain Trail
2013-11-20
169
Henry Margusity
Removed tree from the ridge. Made a trail around the leaning tree on upper Lonberger for safety until the wind blows it down.
Tussey Mountain Trail
2013-10-28
2.25
Tom Kistler
Eight volunteers, Tom Kislter, Jack Chernega, Allen Neely, Greg Scott, Chris Hort, Neil Millar, Clay Chiles, and Rod Stahl, supervised 24 members of the K.D.R. fraternity for their community service project. Every tool NMBA ownes was used, as we had the entire Cam p Trail (from the end of Corner Road to the Gas Line, then on to the Beer Tap, a portion of the top of the Tussey Extension, and the rest of the Tussey Ridge Trail from the Beer Tap, west to the spot where other volunteers had stopped! The whol area is open and clear! Enjoy. The kids were coureous, and hard working. A real joy to deal with them.
OtherRothrock
2013-10-27
170.75
Terri Rudy
Bear Meadows Road - 17 members - Jim Malta, Donna Matthews, Carol Younkins, Terri Rudy, Neil Millar, Perry Schram, Marley, Adam, Jonas, Scott Sheeder, Nick Sloff, Dave Coggins, Betty Harper, Mike Dwyer, Rob Sharer, Edie Sharer, and Lora Zimmerman - cleaned up trash on Bear Meadows Road and Galbraith Gap Parking lot.
OtherRothrock
2013-10-19
40.5
Dave Pontzer
Second day running the bobcat 418 and 324 work performed by Ryan E, Mark, Kerry, Dave P and Terri R.
Leniency
2013-10-13
43
Dave Pontzer
Ryan E, Mark, Rich W, Kerry S, ran the bobcat 418,and 324.
Leniency
2013-10-12
22
Dave Pontzer
Thank you to the trail work volunteers who came out to help do finish work on the Chute Trail tonight: Mike Cerenzia, MaryAnn, Dave, Terri, Henry, Neil, and Mike Patten. The Chute Trail is officially open!
Chute
2013-09-29
28.5
Henry Margusity
The loose gravel and shale on the rock slabs were blown clean to improve safety of the trail.
Chute
2013-09-29
1.25
David Recih
Brush cutting with the PSU club in preparation for September 28th race. 8 people showed up and we finished clearing from greenshoot to the start of the descent (large boulder outcrop).
Bald Knob Ridge Trail
2013-09-15
32
Aaron Pontzer
8 person work crew bench cut a section of Greenshoot trail, stabilized a rocky section, and built a grade reversal to improve drainage. The volunteer crew was made up of: Aaron Pontzer, Aaron Hofelt, Lora Zimmerman, David Riebel, Kate Fox, Jim Glover, Mark Werkheiser, and Marc Wisniewski. Volunteers traveled from State College; Port Matilda; Tyrone; and Annapolis, MD.
Greenshoot
2013-09-14
35
David Reich
Brush cutting
Bald Knob Ridge Trail
2013-09-08
36
Neil Millar
Brush cutting on Ridge trail towards the gas line
Tussey Mountain Trail
2013-09-08
24
Scott Corbin
Clear overgrowth between Spencer and Wallace, and cleared one tree.
Telephone
2013-09-03
5
Scott Corbin
Cleared a tree on Dutch Avlin (near spur to Cooper's Gap road) and one on lower Sassafras.
Sassafras
2013-08-18
2
Dave Pontzer
60+ man hours tonight on Tussey Ridge Trail clearing from Filmore to the end of the burn section. Thank you to the members who VOLUNTEERED their time on the Ridge tonight: Donna Matthews, Carol Younkins, Lora Zimmerman, Jim Glover, David Pontzer, Ryan Eisenhower, Dave Sharer, Terri Rudy, Krista Sharer, MaryAnn Hanlon, Mary Dean Coleman Kelly, Neil Millar, and Will Farwell. Great job everyone! Thank you!
Tussey Mountain Trail
2013-08-18
73
Matt Ferrari
Brush cutting, loppering, raking
Indian
2013-08-13
2.75
Aaron Hofelt
Removed deadfall and improved trail tread sustainability.
Three Bridges
2013-08-12
1.5
Mike Bush
Mike Bush, Rich Straub - Brush cutting, loppering, raking
Indian
2013-08-11
2.75
Aaron Pontzer
Helped DCNR and other volunteers with building the Chute Trail re-route.
Chute
2013-08-10
3.5
Craig Fleming
Craig Fleming and Dave Pontzer brush cut, weed wacked and racked Lower trail down to and around the Chimney.
Lower Trail
2013-08-01
9
Dave Pontzer
Installed two signs Jaunt trail and one on Leniency trail with Craig Fleming.
Jaunt Trail
2013-07-31
9
Dave Pontzer
Matthew Beyerle for his eagle scout project installed 15 trail signs and loppered a section of tussey mt trail, for a total of 125 hours over three work days.
Tussey Mountain Trail
2013-07-29
127
Aaron Hofelt
Thickhead Mountain Road - removed 4-5 deadfall.
Other
2013-07-26
1
Mike Bush
With Rich Straub - Remove deadfall from lower portion, trim long hanging branches.
Little Shingletown Trail
2013-07-25
1.75
Aaron Hofelt
Removed alternate path around the rock garden.
Three Bridges
2013-07-22
1
Tom Kistler
Chainsawed 4 trees off of the two branches of Deaf Run Trail. Smooth and clear now! Let 'er rip!
OtherRothrock
2013-07-20
1.5
Mike Bush
Brush cutting, raking, lopping - with Rich Straub
Detweiler Run
2013-07-17
3.75
Matt Crook
Long Mountain - Loppering, Clearing - with Terri Rudy
Other
2013-07-16
5.5
Neil Millar
Brush and grass cutting
Tussey Mountain Trail
2013-07-05
6.5
Neil Millar
Grass cutting on the tracks off laurel run rd down to sand spring trail
Sand Spring Trail
2013-06-23
2
Neil Millar
Benching trail in lower section
Greenshoot
2013-06-21
2.5
Neil Millar
Benching trail in lower section
Greenshoot
2013-06-21
13
Aaron Hofelt
benching - with Tara Verity, Kelly Shaffer, Jason Stout, Lora Zimmerman, Mike Cerenzia , Neil Millar
Greenshoot
2013-06-21
24.5
Neil Millar
Trim brush
Greenshoot
2013-06-17
2
Mike Bush
with Rich Straub - Brush cutting, raking, lopping
Tussey Mountain Trail
2013-06-14
6.5
Henry Margusity
Cut tree off the trail.
North Meadows
2013-06-06
1.5
Dave Pontzer
Kirsty and I cut out logs and leaf blew out leniency trail.
Leniency
2013-06-05
9
Henry Margusity
Cleared tree down on connector between Charcoal Flats and Lower Trail out by Shingletown.
Charcoal Flats
2013-06-01
1.25
Hnery Margusity
Removed tree from Bald Knob. Cleaned up Shingletown and CharcoalFlats.
Bald Knob Ridge Trail
2013-05-31
2.75
Hnery Margusity
Removed large tree from New Laurel Run. Removed Trees off the Laurel Run RD and off the Firetown RD.
New Laurel Run
2013-05-24
1.75
David P
made it to the top!!!! bench cutting with the bobcat 324. Ryan, Dave P, Dave S, Mark F, Terri R, Kerry S.
Leniency
2012-05-10
24
hodog
removed root ball blocking trail
Three Bridges
20017-05-11
2.5